CONSTRUCTION OF SWIMMING POOL IN NYARI

work scope Pool construction | Pool Equiping | Landscaping As the main contractor, we organized the resources, procured specialized services contractors and ensured quality and timely delivery of the works. Works included setting out, excavations, pool construction and equipping and landscaping.

CONSTRUCTION OF SWIMMING POOL IN NYERI

Work Scope: Pool construction | Pool Equiping | Landscaping As the main contractor, we organized the resources, procured specialized services contractors and ensured quality and timely delivery of the works.Works included setting out, excavations,pool construction and  equipping and landscaping.pool construction and equipping and landscaping. Works included setting out, excavations, Categories: Pool Construction & Equipping Client: [...]

CONSTRUCTION OF 4BR MAISONNETTE IN KANGESO

Structural design | Civil Works | Landscaping. As the structural designer, we provided designs, working drawings and supervision of structural works for the project. We are also engaged in civil works for drive ways and plumbing and landscaping.Works included structural designs, drawings, supervision, civil works and lanscaping. Categories: Lanscape Design and Civil Works. Client: Hon. [...]

Nairobi – Mombasa SGR Project

Work Scope:

Construction Services for drainage and protection works
along the railroad corridor Between Mariakani and
Samburu workstations.

BUTALI BRIDGES DESIGN & SUPERVISION

Design and Supervision of 13No Bridges for Butali Sugar Zone . As the design and supervision consultant, we conducted the feasibility studies, geotechnical surveys…

UPGRADING OF OLOLUNGA MUKENYO ROAD

Construction Services for earthworks for the road.
As a specialized works contractor, we organized the
resources and ensure quality and timely delivery…

GARISSA SEWERAGE PROJECT PHASE II

Installation of sewer pipelines for Garissa Sewerage Project Phase II .
As the pipeline installation contractor, we prepared the bedding, laid the pipes, tested, backfilled and commisioned the pipelines.

CONSTRUCTION OF 3BR BUNGALOW

word scope
Architectural and Structural Design | Construction Works
As the main contractor, we organized the resources,
procured specialized services contractors…

UPGRADING OF MISIKHU NAITIRI BRIGADIER ROAD

Bitumen works for the entire road. As the bitumen works contractor, we organized the resources and ensured timely delivery of the works.Works included supply of bitumen, priming and bituminous surface dressing.

CONSTRUCTION OF STUDENT HOSTELS FOR BONDO UNIVERSITY COLLEGE

Building Works
As the building works subcontractor, we organized the
resources, procured specialized services contractors..